Necessary Safety Measures When Lifting Important Objects

In each operation, the heavy objects shall be lifted about 30cm above the ground, and the operators shall check the binding firmness and balance of the lifted objects, and then continue to lift the objects;

When starting the machine, the heavy objects shall be lifted about 30cm from the ground, and the operation can be started only after confirming that the brake works reliably;

When lifting heavy objects, the lifting and lowering shall be balanced, and the fast lowering time shall not be too long. When the lowering speed of the heavy objects is greater than the synchronous speed of the motor, it is not allowed to directly reverse connect and make the heavy objects. When the heavy objects fall rapidly, it is not allowed to stop suddenly;

When the hoisted object needs to run in reverse, the controller must be turned to the zero position first, and the reverse operation can only be carried out after the mechanism is completely stopped and the object is balanced. It is forbidden to use reverse operation for parking to avoid emergency braking;

When the hook is lowered to the lowest position or the boom is east to the maximum amplitude position, at least 3 circles of wire rope shall be left on the hoisting and luffing drum, and the wire rope shall be wound neatly on the drum;

Adjustment and maintenance of transmission parts must be carried out after shutdown;

In case of sudden power failure or other faults during operation, try to make the hoisted object fall to the ground and not stay in the air;

When the machine is stopped, the boom shall be moved to the maximum extent, turned to the direction of downwind, the empty hook shall be raised 5-6m away from the top of the boom, the control handle of each controller shall be placed at the zero pole, the power shall be cut off, and the external power scribe shall not leave until all parts are checked to be correct.

    Name:*

    Email:*

    Phone:*

    Country

    Message:*

    GantryCranes

    Share
    Published by
    GantryCranes

    Recent Posts

    AQ-MH 10ton Single Girder Gantry Crane Installed in Uzbekistan

    It is good news from one of our customers in Uzbekistan that the AQ-MH 10…

    4 years ago

    Gantry Crane Types

    AQ-MH model electric hoist gantry crane is used together with CD1,MD1 model electric hoists. The…

    4 years ago

    Information of Rubber Tyred Container Gantry Crane

    Rubber tyred container gantry crane, abbreviated as RTG, is a special machine for large specialized…

    4 years ago

    Main Components of Double Girder Gantry Crane

    Electric double girder gantry crane is mainly composed of crane operation mechanism, lower crossbeam, supporting leg, cab, main…

    4 years ago

    Metal Structure of Rail Container Gantry Crane

    The steel structure of rail container gantry crane generally adopts box structure. In order to…

    4 years ago

    Daily Inspection and Maintenance of Gantry Crane

    1.Inspect the wear condition of the wire rope and replace it as appropriate; 2.Check the…

    4 years ago
    Get Free Quote!
    X Get Free Quote!

      Name:*

      Email:*

      Phone:*

      Country

      Message:*